CIVIL: INDUSTRIAL
DEVELOPMENT
CONCRETE BLOCK MANUFACTURING FACILITIES
HOMESTEAD ADONEL CONCRETE Homestead, Florida
C3TS’ first
contract with Adonel Concrete was to expand their batching
capabilities at their existing plant facility located
in Homestead in unincorporated Miami-Dade County. The
spike in concrete demands prompted the need for an
additional concrete batch plant located next to their
existing set-up. The improvements at the existing
4.88-acre developed site also included a new containment
area to house two 5,000 gallon diesel storage tanks
for concrete truck re-fueling. With the expansion,
the new plant more than doubled its capacity, allowing
Adonel Concrete to keep up with the local concrete
demands. Construction was completed in 2004.
WEST PALM BEACH ADONEL CONCRETE
Palm Beach County, Florida
Following
the first project, C3TS was then contracted by Adonel
Concrete to expand their concrete services into Palm
Beach County. The project involved the site planning,
design, permitting and construction administration
of two new concrete batch plants located on 5.26 acres
of previously undeveloped land. The site is part
of a 4,000-acre mining facility owned and operated
by Palm Beach Aggregates. Site elements include
two complete batching plants, a wash facility for six
concrete trucks with a closed loop water reclamation
system, material storage bins, diesel tank storage,
admixture containment area, a wet well and septic tank,
and the required drainage facilities. The operations
at concrete batch plants, especially at the truck wash
facility, are very environmentally sensitive and were
carefully designed to comply with state permit requirements. The
construction was completed in March of 2006.
DORAL ADONEL CONCRETE
Doral, Florida
Another
project that C3TS completed for Adonel Concrete was
the expansion of their batching capabilities at their
existing plant facility located in Doral in unincorporated
Miami-Dade County. The spike in concrete demands
prompted the need for an additional concrete batch
plant located next to their existing set-up. The
site proved to have many challenges as the plant foundations
had to fit within inches of the existing plant, and
required the relocation of an existing electrical and
mechanical room. The improvements at the existing
3.56-acre developed site allowed Adonel Concrete to
double their batching capacity. Construction
was completed in October of 2006.
FORT PIERCE ADONEL CONCRETE
Fort Pierce, Florida
C3TS
was also contracted by Adonel Concrete to expand their
concrete services further north into St. Lucie County. This
project included site planning, design, permitting
and construction administration of 2 new concrete batch
plants located on an undeveloped 9.22 acre site in
an industrial park County. Site elements include
2 complete batching plants, truck wash facility for
6 concrete trucks with a closed loop water reclamation
system, material storage bins, diesel tank storage,
admixture containment area, railroad extension for
delivering materials complete with a rail unloading
system, utility extensions, and the required drainage
facilities including an on-site wet detention facility
and minor modifications to the existing off-site final
retention pond. Again, the environmental and
drainage permitting proved challenging in order to
satisfy state and local requirements. The construction
was completed in March of 2007.
LIGHT INDUSTRIAL FACILITIES
Throughout Florida
The firm’s staff has extensive experience in the design and retrofit of various light industrial facilities. Experience includes the Busch Boulevard Concrete Paverstone Plant in Tampa, Florida. This project was commissioned by Tarmac and encompassed the architectural and engineering design of a state-of-the-art facility, which operates with computerized Omag paver machines. Additional projects include Flamingo Graphics (the official contractors to the Florida Lottery), for which C3TS designed 53,000 square-feet of printing facilities, as well as handling and distribution facilities, to exclusively handle the Florida Lottery’s printing needs.
MAINTENANCE FACILITIES
Throughout Florida
C3TS’s extensive experience in the design of maintenance facilities includes the City of North Miami Beach Public Works Facility. The firm provided civil engineering and architectural peer review services for this 12,000 square-foot truck wash, vehicle service and office facility, which was featured for its environmentally-conscious design in Public Works Magazine. Additional project experience includes the Design-Build of the FDOT District Six North Miami-Dade Maintenance Facility, as well as master planning design for the City of Coral Springs Westside Municipal Maintenance Facility (individual staff experience).
|